Projects | Hospitality and Residential

Our diverse experience in this field began in the 1980’s as the international tourist and business boom gave rise to demand for independent high end hotels complete with business conference centers, banquet halls, restaurants and shopping areas. By 2010, Reliance had completed over 750 hotel rooms and associated conference spaces. As the market evolved and baby boomers turned into empty nesters, high rise condominium construction became more common. Our vast experience in this domain ranges from affordable residential units for first-time buyers to condominium developments for seasoned buyers, complete with high-end amenities. In 2009, the Canadian housing market emerged from the recession and by 2010, Reliance had completed or had under construction over 3,000 condo units in eastern Canada.

Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6
»
455 Rene-Levesque West Under construction  |  475,000 sq.ft.
Contract delivery :
Construction Management
Located in the heart of Montreal's entertainment district in the downtown area, 455 Rene-Levesque will consist of two impressive residential towers, the first composed of 36 floors and the second 45 floors, with a total of 820 rental units. The project will achieve a dual design by being in harmony with one of Montreal's oldest Church to its north, while still matching with the modern downtown atmosphere with its glass design and slightly tilted architecture. The building's surroundings will include the Quartier des Spectacles, two metro stations, and bus and train stations. These two buildings will become important Montreal landmarks, and will be joining the rest of the sky scrapers in the downtown core which have helped shape the beauty and splendor of the city.
Central Parc Laval 2 Under construction  |  337,651 sq. ft.
Contract delivery :
Construction Management
A walking distance from Carrefour Laval and in close proximity of the city’s downtown area, Central Parc 2 will feature 19 floors and 193 units, including a mezzanine on the top floor complete with all the amenities needed to appreciate the view. This urban rooftop terrace covers 1,700 sq. ft. and is equipped with an infinity pool, a sauna, a barbeque area, a bar lounge and a common area, offering a vacation atmosphere at home. The lobby will offer a spacious multi-purpose room and kitchenette for the tenants to host a variety of events for leisure and business purposes.

JOIA Under construction  |  150,000 sf
Contract delivery :
Construction Management
Located in Montreal’s sought-after Griffintown,this $30M project will feature 118 high end rental units that extend over 150,000 square feet. The building will stand at 8 storeys high and contain 2 spacious basements. It will also feature a rooftop terrace, rooftop jogging track, state-of-the-art gym and impressive common areas.

71 Redpath Under construction  |  180,000 sf
Contract delivery :
Construction Management
Located on the corner of Redpath Avenue and Soudan Avenue, this 22-storey rental tower in the Mount Pleasant West area of Toronto includes a 3-storey podium, totalling 180 suites. It features state-of-the-art amenities, ranging from a rooftop party room, pool, terraces, a large fourth floor fitness center, guest suite, private dining room, and a business lounge area, all on the ground floor. There are four underground levels of parking that provide a total of 144 spaces and 180 bicycle spaces.

Kingsway Under construction  |  650,000 sq.ft.
Contract delivery :
Construction Management
Featuring a total of 474 new suites, the redevelopment of these 5 low rise buildings consists of two new rental buildings, two new condo buildings, and one existing rental building. Located in the charming Kingsway Village area of Etobicoke, there is an abundance of green roof space incorporated intoeach building, 559 underground parking spaces, and 389 bicycle spaces.

The numerous buildings range from 7 to 17 storeys and include amenities such as a fitness rooms, party room, outdoor terraces, laundry room, games rooms, private dining rooms, event lounge, tech lounge, and pet spa.

Gallery sur le Canal 3 Under construction  |  260,000 sq.ft.
Contract delivery :
Construction Management
This Gallery sur le Canal third chapter will be the finishing touch of the Gallery sur le Canal three-part condo project in Griffintown, as the third and final development is being built. Comprised of 159 units and on the Lachine canal, this project’s design combines the area’s industrial heritage with modern architecture to create the perfect atmosphere for an inviting home in a flourishing community. To take advantage of the canal’s natural beauty, the rooftop amenities offer a breath-taking view of the water, enhancing the terrace experience is a swimming pool and a common area ideal for relaxing after a long day. Its proximity to the canal also offers a pedestrian walking trail and other outdoor activity options such as cycling, roller-blading and canoe-kayaking. Gallery sur le Canal 3 recognizes how to maximize the Lachine experience and makes it its primary focus.

The Hampstead Majestic Under construction  |  228,000 sq.ft.
Contract delivery :
Construction Management
This new luxurious rental tower is an all precast concrete building with luxury amenities, 2 underground parking levels and is slated for delivery in 2020.

Bronte Village Under construction  |  862,000 sq.ft.
Contract delivery :
Construction Management
Located in picturesque South Oakville, the redevelopment of the existing 1970’s era Bronte Village Mall will include the construction of two new modern residential towers that will contain 481 luxurious suites with 614 underground spaces and will also include the addition of 15,000 square feet of retail space. The suites will range from 700 square feet to over 1200 square feet and will be equipped with high end finishes and appliances. Additionally the buildings will be fully equipped with amenities including a pool, roof-top patio and lounge, party room, and a fitness room. Developed by Crombie REIT and Prince Development, this revitalization will hold true to the current aesthetic and culture of the Bronte neighbourhood and will bring an attractive and exciting renewal to the area.

Tour des Canadiens 3 2020  |  685,000 s.f.
Contract delivery :
Construction Management
The third phase of the famed residential Tour des Canadiens project, located just south of the Bell Center, includes an all-glass 54 storey, 528,000 sq.ft. above grade tower featuring 565 residential units. The building’s amenities of this $150M project encompasses multiple party rooms, retail stores, a gym, a game room, an indoor pool, a lounge, a spa and outdoor terraces, and an indoor rooftop skylounge. The landscape components include not one, but two parks adjacent to the tower – including a unique urban design for a pocket park with water features on north and south sides.

MYX Condos Under construction  |  378,000 sf
Contract delivery :
Construction Management
MYX condos, the next installment in a mix of condos, lofts and townhouses that includes Evolo X, Evolo S, Evolo 2, Evolo 1, Pavillon Evolo and ZUNI, located on the Pointe-Nord in Nun’s Island includes 378,000 sq.ft. of gross constructed area and is scheduled to start in the fall of 2018. The project consists of 196 units over 8 storeys and will feature a rooftop pool and chalet complete with kitchen, fireplace, communal table, indoor and outdoor lounges, and a state of the art rooftop gym. Additionally, the commercial ground floor will feature outdoor covered parking for commercial clients.
«
1 - 2 - 3 - 4 - 5 - 6
»