The
third phase of the famed residential Tour des Canadiens project, located just
south of the Bell Center, includes an all-glass 54 storey, 528,000 sq.ft. above
grade tower featuring 565 residential units. The building’s amenities of this
$150M project encompasses multiple party rooms, retail stores, a gym, a game
room, an indoor pool, a lounge, a spa and outdoor terraces, and an indoor
rooftop skylounge. The landscape components include not one, but two parks adjacent
to the tower – including a unique urban design for a pocket park with water
features on north and south sides.
Projects |
Tour des Canadiens 3 2020 | 685,000 sq.ft.
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
YC Condos 2019 | 650,000 sq.ft.
Location :
Toronto, Ontario
Toronto, Ontario
Contract delivery :
Construction Management
Construction Management
$130M residential tower at
Yonge at College in downtown Toronto, featuring 636 residential units and
developed by Canderel and Kingsett Capital. This modern and timeless 62 storey glass
tower includes retail spaces located on the first 2 floors, 'live & work'
units on 4th & 5th floors, and amenity spaces on the top floors. The
amenity spaces include an infinity pool overlooking downtown Toronto, and a
full spa for men and women. The residential suites include high end finishes
and appliances.
Kingsway Under construction | 650,000 sq.ft.
Location :
Toronto, Ontario
Toronto, Ontario
Contract delivery :
Construction Management
Construction Management
Featuring a total of 474
new suites, the redevelopment of these 5 low rise buildings consists of two new
rental buildings, two new condo buildings, and one existing rental building.
Located in the charming Kingsway Village area of Etobicoke, there is an
abundance of green roof space incorporated into each building, 559
underground parking spaces, and 389 bicycle spaces.
The numerous buildings range from 7 to 17 storeys and include amenities such as a fitness room, party room, outdoor terraces, laundry room, games rooms, private dining rooms, event lounge, tech lounge, and pet spa.
The numerous buildings range from 7 to 17 storeys and include amenities such as a fitness room, party room, outdoor terraces, laundry room, games rooms, private dining rooms, event lounge, tech lounge, and pet spa.
Symphonia VIU 2024 | 550,000 sq.ft
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
Construction of the phase 2A project comprising 46 floors including 2 floors of underground parking. The podium and garage total 68,000 square feet and each typical floor of the tower will be 9,000 square feet. The curtain wall envelope, the interior finishes of the condos including high-end engineering flooring, Miele and Bosch appliances, and Eruopean style doors, as well as the common areas including an interior pool, a sauna and a gym, all highlight the high-end status of this project.
Ericsson 1984 - 2002 | 550,000 sf
Location :
TMR, Quebec
TMR, Quebec

Contract delivery :
Construction Management, Design Build Mechanical
Construction Management, Design Build Mechanical
Over the course of 7 consecutive years, Reliance formed an integral part of the project team acting as General Contractor for Ericsson’s North American Research and Development Center. Once completed, Reliance had built over 550,000 square feet of new construction, consisting of 4 buildings and had completely renovated 250,000 square feet of existing space. Each building included separate underground parking linked by underground tunnels. All office areas were constructed to Class ‘A’ specifications and included details such an open atrium, a cafeteria with a full commercial kitchen and recreational facilities. All phases of the project were executed on a fast track basis.
750 Peel Under construction | 544,612 sq.ft.
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
Construction of a new residential tower intended for rental apartments. The building is a concrete structure with three basement levels and 37 stories above grade. Three sides of the perimeter are shored with a soldier pile and wood lagging wall. The building has 509 residential units as well as one large commercial space. The building includes 5 elevators on a destination dispatch system as well as a 6th elevator exclusively for the commercial space and access to the parking garage.
Kraft Foods 2005 | 530,000 sf
Location :
Vaudreuil, Quebec
Vaudreuil, Quebec

Contract delivery :
Construction Management
Construction Management
This is a new distribution and product mixing center for Kraft Canada. All products manufactured within 100 km of Montreal are shipped directly to this facility for eventual distribution across North America. Total building size is 530,000 square feet, 30'-0" clear, including 50'-0" bays, with refrigerated and air conditioned warehouse areas. The project was designed and built in a period of less than 8 months. As a result of the weak clay soils available, piled foundations and a drained construction platform with overbuilt access roads were required. Site logistics and the construction schedule were further complicated by the fact that the foundation work occurred in the early spring season. The slab design allows for heavy floor loading and includes features such as non-corrosive metallic hardener, special floor sealers and fully filled sawcuts. The shipping and receiving docks consist of continuous depressed trenches with vertical lift levelers, with all dock equipment, overhead doors, and dock lifts fully automated and integrally connected.
Voilà 2021 | 498,000 sq.ft.
Location :
Pointe-Claire, Quebec
Pointe-Claire, Quebec
Contract delivery :
Construction Management
Construction Management
Voila by Sobeys is the construction of an automated
warehouse project specifically designed for best-in-class grocery home delivery. Totalling 498,000 square feet, this project located in Pointe-Claire is the first
of its kind in Quebec and serves both the region of Ottawa and Quebec. This
innovative service has the capacity to serve up to 39,000 products
including fresh produce.
Agropur 2016 | 490,000 sq.ft.
Location :
St-Hubert, Quebec
St-Hubert, Quebec
Contract delivery :
Construction Management
Construction Management


This $70M LEED™ Silver certified corporate campus of 490,000 sq.ft. has 800 underground parking spots, an
innovative hot-water perimeter heating incorporating an energy-recovery
system, and cooling and state of the
art LED interior lighting. The exterior facade is primarily curtain wall and
the interior is constructed with the latest in modern office design.
Le Livmore 2022 | 475,000 sq.ft.
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
Located in the heart of Montreal's entertainment district in the downtown area, 455 Rene-Levesque will consist of two impressive residential towers, the first composed of 36 floors and the second 45 floors, with a total of 820 rental units. The project will achieve a dual design by being in harmony with one of Montreal's oldest Church to its north, while still matching with the modern downtown atmosphere with its glass design and slightly tilted architecture. The building's surroundings will include the Quartier des Spectacles, two metro stations, and bus and train stations. These two buildings will become important Montreal landmarks, and will be joining the rest of the sky scrapers in the downtown core which have helped shape the beauty and splendor of the city.