Tesla 2021 | 35,475 sq.ft.
Location :
Saint-Bruno-de-Montarville, Quebec
Saint-Bruno-de-Montarville, Quebec
Contract delivery :
Construction Management
Construction Management
The Tesla dealership in Saint-Bruno-de-Montarville stands out with its design focused on assembly-line work and its various service stations. The dealership has 8 V3 superchargers.
Lyonleaf 2019 | 38,000 sq. ft.
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
The Lyonleaf facility is one of Quebec’s leading producer of cannabis products. Due to the distinct conditions
the plants have to be grown in, the construction included the installation of
insulated walls, as well as sophisticated and complex air conditioning,
ventilation, humidification, and drying systems, all centrally controlled to
accommodate specific environmental conditions. This intricate existing building
required a complete rebuild from inside-out to accommodate extensive mechanical
rooms, roof structures, and specialized flooring. Composed of approximately 50
rooms, 30 of those rooms house diverse types of production, each requiring a
specific environment.
MDA 2011 | 41,000 sf
Location :
Ste. Anne de Bellevue, Quebec
Ste. Anne de Bellevue, Quebec
Contract delivery :
Construction Management
Construction Management
This 44,000 square foot building includes a mezzanine of 13,500 square feet for a satellite manufacturer. Special attributes include a 2,520 sq.ft. clean room that gives access to a larger 45’ clear, 12,250 sq.ft. clean room, classified as a class 100,000 clean room. It is equipped with a pit to receive a 28’-0’’ x 24’-0’’ vibrating table and has two overhead cranes of 10 and 15 tons respectively. It meets all the technical, mechanical and electrical requirements of the International Aerospace Industry.
Hard Candy Toronto 2013 | 45,000 sf
Location :
Toronto, Ontario
Toronto, Ontario
Contract delivery :
Construction Management
Construction Management
Madonna's
new international gym brand. Hard Candy
opened its first and only North American location in Toronto. This 45,000 sq. ft. high-end facility
includes hot yoga, spinning classes, free weights and a luxurious locker and
spa facility.
Delta Mont Saint-Anne 2021 | 45,000 sq.ft.
Location :
Mont Saint-Anne, Quebec
Mont Saint-Anne, Quebec
Contract delivery :
Construction Management
Construction Management
The 30,000 square feet renovation of the hotel’s public area will include a brand-new façade and
canopy as well as the expansion of the exising aquatic center including an SPA
and Nordic baths totalling 15,000 square feet. Aside from the beautiful tall
ceilings and fireplace at the lobby, the public space will host artwork by
local artists, one of which is a very large decorative leaf that will hang
over the reception area.
Holt Renfrew Boutiques 2020 | 46,288 sf
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
Reliance was responsible for the fit up and contracting for 106 designer boutiques totalling over 46,000 sf, inside the Holt Renfrew flagship store, working with suppliers and designers from all over the world, in a synchronized manner to coordinate a store opening date.
Le Charlebois 2023 | 52,150 sq.ft.
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
This project is a luxury condominium building built on the former Pioneer site, in the heart of Pointe-Claire village. It is a 3 storey new construction of 52,150 square feet including one storey of underground parking. There will be 14 unique condo units and 4 commercial spaces on the ground floor. The building occupies the entire site.
Iogen 2006 | 57,000 sq.ft.
Location :
Ottawa, Ontario
Ottawa, Ontario

Contract delivery :
Construction Management
Construction Management
New office and lab facility located in Ottawa for Iogen Corporation, consisting of a 3 storey concrete structure totalling 57,000 sf, of which 12,000 sf is allocated to to laboratories. The building's design includes provisions for vertical/horizontal expansion of an additional 23,000 sf. Our participation on this project began day 1 during initial lease negotiations through the entire design stage and finally through the construction period.

Le Faubourg 2019 | 60,000 s.f.
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
The renovation of this existing commercial shopping center includes complete asbestos abatement and the addition of a brand new foodcourt and grocery store while tenants remain in operation. The project was designed by Geiger Huot Architects and is scheduled for completion in April 2018.

Au Village du Musée 2005 | 60,455 sf
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
A 5-storey condominium development consisting of 6,000 sf of below ground parking, upgrade lobby and 47 finished luxury condo units. Reliance was responsible for completion and fit up of all 47 units according to the individual owner's requirements, including renovation to an existing building (circa 1890) configured for 5 ultra-luxurious "historic" condo units.