Tesla 2021  |  35,475 sq.ft.
Contract delivery :
Construction Management
The Tesla dealership in Saint-Bruno-de-Montarville stands out with its design focused on assembly-line work and its various service stations. The dealership has 8 V3 superchargers.
Lyonleaf 2019  |  38,000 sq. ft.
Contract delivery :
Construction Management
The Lyonleaf facility is one of Quebec’s leading producer of cannabis products. Due to the distinct conditions the plants have to be grown in, the construction included the installation of insulated walls, as well as sophisticated and complex air conditioning, ventilation, humidification, and drying systems, all centrally controlled to accommodate specific environmental conditions. This intricate existing building required a complete rebuild from inside-out to accommodate extensive mechanical rooms, roof structures, and specialized flooring. Composed of approximately 50 rooms, 30 of those rooms house diverse types of production, each requiring a specific environment.

MDA 2011  |  41,000 sf
Contract delivery :
Construction Management
This 44,000 square foot building includes a mezzanine of 13,500 square feet for a satellite manufacturer. Special attributes include a 2,520 sq.ft. clean room that gives access to a larger 45’ clear, 12,250 sq.ft. clean room, classified as a class 100,000 clean room. It is equipped with a pit to receive a 28’-0’’ x 24’-0’’ vibrating table and has two overhead cranes of 10 and 15 tons respectively. It meets all the technical, mechanical and electrical requirements of the International Aerospace Industry.
Hard Candy Toronto 2013  |  45,000 sf
Contract delivery :
Construction Management
Madonna's new international gym brand. Hard Candy opened its first and only North American location in Toronto. This 45,000 sq. ft. high-end facility includes hot yoga, spinning classes, free weights and a luxurious locker and spa facility.
Delta Mont Saint-Anne 2021  |  45,000 sq.ft.
Contract delivery :
Construction Management
The 30,000 square feet renovation of the hotel’s public area will include a brand-new façade and canopy as well as the expansion of the exising aquatic center including an SPA and Nordic baths totalling 15,000 square feet. Aside from the beautiful tall ceilings and fireplace at the lobby, the public space will host artwork by local artists, one of which is a very large decorative leaf that will hang over the reception area.
Holt Renfrew Boutiques 2020  |  46,288 sf
Contract delivery :
Construction Management
Reliance was responsible for the fit up and contracting for 106 designer boutiques totalling over 46,000 sf, inside the Holt Renfrew flagship store, working with suppliers and designers from all over the world, in a synchronized manner to coordinate a store opening date.
Le Charlebois 2023  |  52,150 sq.ft.
Contract delivery :
Construction Management
This project is a luxury condominium building built on the former Pioneer site, in the heart of Pointe-Claire village. It is a 3 storey new construction of 52,150 square feet including one storey of underground parking. There will be 14 unique condo units and 4 commercial spaces on the ground floor. The building occupies the entire site.
Iogen 2006  |  57,000 sq.ft.
Contract delivery :
Construction Management
New office and lab facility located in Ottawa for Iogen Corporation, consisting of a 3 storey concrete structure totalling 57,000 sf, of which 12,000 sf is allocated to to laboratories. The building's design includes provisions for vertical/horizontal expansion of an additional 23,000 sf. Our participation on this project began day 1 during initial lease negotiations through the entire design stage and finally through the construction period.
Le Faubourg 2019  |  60,000 s.f.
Contract delivery :
Construction Management
The renovation of this existing commercial shopping center includes complete asbestos abatement and the addition of a brand new foodcourt and grocery store while tenants remain in operation. The project was designed by Geiger Huot Architects and is scheduled for completion in April 2018.

Au Village du Musée 2005  |  60,455 sf
Contract delivery :
Construction Management
A 5-storey condominium development consisting of 6,000 sf of below ground parking, upgrade lobby and 47 finished luxury condo units. Reliance was responsible for completion and fit up of all 47 units according to the individual owner's requirements, including renovation to an existing building (circa 1890) configured for 5 ultra-luxurious "historic" condo units.
«