Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15
»
Simons Under construction  |  580,000 sf
Contract delivery :
Fixed Price
The construction of Simons new 40' high distribution facility in Quebec City started in May 2018. It will include 470,000 s.f. of warehouse, 47 shipping and receiving doors along with an attached 110,000 s.f. office facility.
Bronte Village Under construction  |  862,000 s.f.
Contract delivery :
Located in picturesque South Oakville, the redevelopment of the existing 1970’s era Bronte Village Mall will include the construction of two new modern residential towers that will contain 481 luxurious suites with 614 underground spaces and will also include the addition of 15,000 square feet of retail space. The suites will range from 700 square feet to over 1200 square feet and will be equipped with high end finishes and appliances. Additionally the buildings will be fully equipped with amenities including a pool, roof-top patio and lounge, party room, and a fitness room. Developed by Crombie REIT and Prince Development, this revitalization will hold true to the current aesthetic and culture of the Bronte neighbourhood and will bring an attractive and exciting renewal to the area.

Méga Parc Under construction  |  150,000 sf
Contract delivery :
Construction Management
Galeries de la Capitale is revamping its attraction park! Inspired by the steampunk universe, the new Méga Parc includes 18 rides and attractions, the longest skating path in the country, a stage with a complete sound system, a giant screen, an interactive water fountain displaying sound and light choreography and the very first hubless wheel in North America! The construction started in September 2017.





Ogilvy - Holt Renfrew Under construction  |  217,000 sf
Contract delivery :
Construction Management
The complete renovation and transformation of the existing 217,000 square foot Ogilvy Store as well as an expansion of 40,000 sf of retail space in the new Quadrilatère de la Montagne building started in the fall of 2017. A unique feature of this project is the articulated storefront and canopy at the new public entrance, on Ave. de la Montagne. This project, once completed, will become the flagship store for the Holt Renfrew banner.
Tour des Canadiens 3 Under construction  |  685,000 s.f.
Contract delivery :
Construction Management
The third phase of the famed residential Tour des Canadiens project, located just south of the Bell Center, includes an all-glass 54 storey, 528,000 sq.ft. above grade tower featuring 565 residential units. The building’s amenities of this $150M project encompasses multiple party rooms, retail stores, a gym, a game room, an indoor pool, a lounge, a spa and outdoor terraces, and an indoor rooftop skylounge. The landscape components include not one, but two parks adjacent to the tower – including a unique urban design for a pocket park with water features on north and south sides.

Audi Queensway Under construction  |  65,000 sf
Contract delivery :
Construction Management
The new Audi Queensway is a 65,000 sq.ft. dealership located at The Queensway and East Mall featuring to the new Audi identity. The dealership includes a 20,000 sq.ft. showroom, 10,000 sq.ft. used car display, and a state of the art service facility with equipment able to handle over 25 vehicles at any given time. The facility also includes a 15,000 sq.ft. basement for additional services as required. The building is equipped with an in ground filtration and recharger systems to limit the storm water discharge into the city storm water systems. A 35,000 sq.ft. green roof will be installed to also assist with storm water retention. A gorgeous landscaped patio, customer bistro and car wash are also scheduled to be installed.
Dollarama 6 Under construction  |  270,000 sf
Contract delivery :
Construction Management
270,000 sq.ft.expansion of one of Dollarama's distribution centers in TMR. The expansion involves 27 new loading docks and a 60,000 sq.ft. mezzanine. The project includes the demolition of two existing industrial buildings to make way for the new expansion.
MYX Condos Under construction  |  378,000 sf
Contract delivery :
Construction Management
MYX condos, the next installment in a mix of condos, lofts and townhouses that includes Evolo X, Evolo S, Evolo 2, Evolo 1, Pavillon Evolo and ZUNI, located on the Pointe-Nord in Nun’s Island includes 378,000 sq.ft. of gross constructed area and is scheduled to start in the fall of 2018. The project consists of 196 units over 8 storeys and will feature a rooftop pool and chalet complete with kitchen, fireplace, communal table, indoor and outdoor lounges, and a state of the art rooftop gym. Additionally, the commercial ground floor will feature outdoor covered parking for commercial clients.



LeCour Langhorne Under construction  |  61,000 sf
Contract delivery :
Construction Management
Luxurious 3 storey townhouses located in the upscale neighbourhood of Hampstead, Quebec. Including 2, 3, 4, and 5 bedrooms options, the units range from 2,580 sf to 3,120 sf with private 2 car underground garages and 9’ ceilings. The development also includes luxurious yards for each townhouse, car charging station infrastructure, and innovative energy conservation design elements. The project is developed by The Benvenuto Group and designed by NEUF Architect(e)s.


Central Parc Laval Under construction  |  352,000 sf
Contract delivery :
22-storey apartment project featuring 198 high-end rental units. Located near Carrefour Laval, this building is planned to be part of 6 building multi-use residential complex including a large private park, commercial units and a hotel. The building features two-storeys of underground parking, a rooftop pool and a gym with a scenic view and panoramic windows at the top floor. Due to new zoning regulations and restrictions, Terra will be the last building allowed in Laval above 15 storeys.

«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15
»