22-storey apartment project featuring 198 high-end rental
units. Located near Carrefour Laval, this building is planned to be part
of 6 building multi-use residential complex including a large private park,
commercial units and a hotel. The building features two-storeys of
underground parking, a rooftop pool and a gym with a scenic view and panoramic
windows at the top floor. Due to new zoning regulations and restrictions,
Central Parc Laval R1, R2 and C1 will be the last buildings allowed in Laval above 15 storeys.
Projects | All projects
Sort by: | year | square footage |
Central Parc Laval R1 2019 | 352,000 sq.ft.
Location :
Laval, Quebec
Laval, Quebec
Contract delivery :
Construction Management
Construction Management
Le Faubourg 2019 | 60,000 s.f.
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
The renovation of this existing commercial shopping center includes complete asbestos abatement and the addition of a brand new foodcourt and grocery store while tenants remain in operation. The project was designed by Geiger Huot Architects and is scheduled for completion in April 2018.
Gallery sur le Canal Phase 2 2019 | 240,000 sf
Location :
Griffintown, Quebec
Griffintown, Quebec
Contract delivery :
Construction Management
Construction Management
The second phase of this Griffintown project, Gallery Lofts sur le Canal 2, will feature 145 luxurious condo units over a total of 240,000 sf. Located near the Lachine Canal, two towers of 14 and 9 floors respectively will complete this concept elaborated by Geiger Huot Architects. The project is currently under construction.
BRIX 2019 | 326,000 sf
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
This 16-storey, 275 units residential rental property is situated in the heart of
downtown Montreal and includes 3 underground parking levels. Its envelope is composed of curtain wall, brick, precast, and will incorporate the existing facade of the 400 Dowd heritage building which was fully restored to its original look, and merged with a new and modern
addition.
In order to reach the desired basement levels, Reliance needed to blast 5 meters of rock. Seismographs were installed in various locations in order to monitor the vibrations of the surroundings buildings. In order not to disturb the adjacent historical building's rubble foundations, Reliance proposed a secant wall installation in lieu of conventional underpinning. A method rarely used in Montreal.
In order to reach the desired basement levels, Reliance needed to blast 5 meters of rock. Seismographs were installed in various locations in order to monitor the vibrations of the surroundings buildings. In order not to disturb the adjacent historical building's rubble foundations, Reliance proposed a secant wall installation in lieu of conventional underpinning. A method rarely used in Montreal.
Méga Parc 2019 | 150,000 sf
Location :
Quebec, Quebec
Quebec, Quebec
Contract delivery :
Construction Management
Construction Management
Galeries de la Capitale has revamped its attraction park! Inspired by the steampunk universe, the new Méga Parc includes 18 rides and attractions, the longest skating path in the country, a stage with a complete sound system, a giant screen, an interactive water fountain displaying sound and light choreography and the very first hubless wheel in North America! The construction started in September 2017.
Le Cour Langhorne 2018 | 61,000 sf
Location :
Hampstead, Quebec
Hampstead, Quebec
Contract delivery :
Construction Management
Construction Management
Luxurious 3 storey townhouses located in the upscale
neighbourhood of Hampstead, Quebec. Including 2, 3, 4, and 5 bedrooms options,
the units range from 2,580 sf to 3,120 sf with private 2 car underground
garages and 9’ ceilings. The development also includes luxurious yards for each townhouse, car charging station infrastructure, and innovative
energy conservation design elements. The project is developed by The Benvenuto
Group and designed by NEUF Architect(e)s.
Jarvis St. Residences 2018 | 200,000 sf
Location :
Toronto, Ontario
Toronto, Ontario
Contract delivery :
Construction Management
Construction Management
This new modern student residence in downtown Toronto features 194,000 sq.ft of student accommodation and at-grade retail, in a 30-storey
building offering a mix of two, three and four bedroom units to house a total
of 593 students. The two-storey podium offers a mix of amenity services to
enhance the student experience. In addition, “Pod Lounges” located every third
floor are designed to provide congregation space for smaller student
gatherings, as well as provide a unique design expression to the building’s
main façade.
Decarie Motors 2018 | 12,500 sf
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
Demolition and renovation of an existing dealership to meet
the new design requirements of Land Rover and Jaguar totaling12,500 sf and including
a complete new showroom.
Tour des Canadiens 2 2019 | 700,000 sf
Location :
Montreal, Quebec
Montreal, Quebec
Contract delivery :
Construction Management
Construction Management
The
second phase of the famed residential Tour des Canadiens project, located just
south of the first phase, includes a 55 storey, 716,000 sq.ft. tower featuring 590
residential units. The building’s amenity spaces, conceived with Montreal’s
downtown energy and vibrancy in mind, include an interior rooftop skylounge, an
indoor/outdoor pool, and a wine bar and wine cellar.
Additionally, the building sits on 55,000 sq.ft. of land, designed as an urban
park, complete with an overhead bridge connection across St. Antoine St.,
connected into the Bell Centre and the Montreal Underground City.
Mazda Des Sources 2017 | 16,000 sf
Location :
Dorval, Quebec
Dorval, Quebec
Contract delivery :
Construction Management
Construction Management
Located in Dorval, this new dealership of 16,000 sf includes an 8 service bays garage, an alignment stop, and two wash bays. The envelope is composed of curtain wall, aluminium composite panels, and corrugated metallic coating while the main showroom features a reflective ceramic wall and suspended ceiling panels held by aircraft cables.