Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»
Audi Brossard 2002  |  8,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This design-built project included the demolition of an existing car showroom and reconstruction of a new one including the renovation of the existing parts area, service department and administrative offices. Gross constructed area is 8,000 square feet.
Park Avenue BMW 2002  |  26,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This 26,000 square foot dealership includes a showroom with all glass curtain wall, administration areas and service and wash bay facilities. The garage includes underfloor exhaust and drainage systems.
Decarie Motors 2002  |  45,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This design-built project was a transformation and renovation of an existing funeral parlor into a high-end vehicle showroom including administrative offices, service bays, wash bays, and 16,000 square feet of underground parking. Underground construction work required the removal of 300'-0'' of load bearing walls and underpinning of the lower existing basement. Gross constructed area was 45,000 square feet.
Dubord and Rainville 2002  |  103,000 sf
Contract delivery :
Fixed Price
Head office for freezer and dry goods warehouse facility. Building included 25,000 sf of freezer space, 5,000 sf of refrigerated space, 32'-0" clear structure, interior loading docks and 9,000 sf of finished offices.
Ericsson 1984 - 2002  |  550,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
Over the course of 7 consecutive years, Reliance formed an integral part of the project team acting as General Contractor for Ericsson’s North American Research and Development Center. Once completed, Reliance had built over 550,000 square feet of new construction, consisting of 4 buildings and had completely renovated 250,000 square feet of existing space. Each building included separate underground parking linked by underground tunnels. All office areas were constructed to Class ‘A’ specifications and included details such an open atrium, a cafeteria with a full commercial kitchen and recreational facilities. All phases of the project were executed on a fast track basis.
Honda Brossard 2002  |  11,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This project included the demolition of an existing car showroom and reconstruction of a new facility with the renovation of the existing parts area, service department and administrative offices. Gross constructed area of 11,000 square feet.
Innes Center 2002  |  102,000 sf
Contract delivery :
This 102,000 square feet regional shopping center in Ottawa, Ontario, Canada, included the construction of 3 retail pavilions and full site development with shared services for big box retailers. The scope of work for this project includes widening of Innes Rd. and installation of new traffic lights.
Liberty Industrial Park 1993 - 2002  |  12 office buildings totalling 700,000 sf
Contract delivery :
Fixed Price
These twelve office buildings featuring class A office fit-ups averaging over 60,000 square feet each, were built between 1993 and 2002 for Liberty Sites Inc. Each structure’s exterior and interior design are unique and were constructed using select materials and finishes, making these facilities some of the most sought-after office space components in Montreal and a benchmark for comparison for new suburban office buildings. In addition to completion of each building’s core and shell for Liberty, Reliance successfully completed tenant fit-ups for clients such as Sony, Motorola, Simmonds, Consoltex, Bell Mobility, Rhone-Poulec Rorer, Robin Hood, Abbott Laboratories, Pitney Bowes, ABB and Medis.
McAuslan Brewery 2002  |  41,000 sf
Contract delivery :
Design Build, Fixed Price
Work began with site decontamination in accordance with environmental laws, and extensive water treatment system for water using in brewing process. Installation of underground sedimentation tanks, piping and treatment tanks was done underground in order to allow space for large fermentation tanks sitting on a thickened reinforced slabs on grade;up to 24" in some areas.
Pfizer 1999, 2002  |  100,000 sf
Contract delivery :
Construction Management
Construction activities at Pfizer's Canadian head offices wereperformed in phases, without interruption at any time to the office environment. The first phase, totaling 75,000 sf of new construction and completed in 1999, consisted of 3 new office levels including one level below grade with a 3 storey atrium including a large skylight. In 2001 Reliance was retained to add a 25,000 sf4th storey above the 1999 office building including a new skylight. The last phase, completed in 2002, involved the renovation of the reception area, drop-off area and new landscaping; the office remained in full operation during the expansion.
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»