Montreal Forum / Pepsi Forum 2000  |  560,000 sf
Contract delivery :
Fixed Price
The Forum, former home to the world famous Montreal Canadiens hockey team, had been empty for years. Rather than demolish the vacant building, Canderel and its partners, the Simon Property Group, DLJ Real Estate and Madison Marquette undertook the challenge of redevelopment, uniting the building's history and future to create a one-of-a-kind, modern entertainment venue, including movie theaters, restaurants and retail space at a cost of approximately 100 million dollars. The existing roof was raised 18'-0" to increase retail space and accommodate a 65'-0" IMAX screen, 3 levels of underground parking, 22 AMC movie theaters, a 3-storey restaurant/bar and smaller retail tenant spaces. The Forum remains one of Montreal's most recognizable landmarks.
Eaton's - Rideau Center 2000  |  250,000 sf
Contract delivery :
Construction Management
Transformation of old 250,000 s.f. Eaton's premises to upgraded Eaton Retail Store for Sears Canada including all new fixtures, concessions and interior fit-up. Job was contracted on a fast-track basis and completed in 3 months. The total cost of renovation was $12,500,000.
Mitec 1999  |  95,000 sf
Contract delivery :
Design Build, Fixed Price
Mitec Telecom’s head office, production facility and distribution center totaling 95,000 square feet, includes a full working cafeteria, 20,000 square feet of offices, and a fully air-conditioned 60,000 square foot production area complete with its anti-static floor covering, burn-in and refrigeration test chambers and 100 foot candle lighting levels.
La Cathedrale 1999  |  300,000 sf
Contract delivery :
Fixed Price
Demolition, enlargement and renovation of popular underground shopping mall on Ste-Catherine Street in downtown Montreal, including conversion of sub-basement foodcourt to public parking garage, construction of new food court on retail level, closing of atrium spaces, creation of new retail areas;all performed without interruption of normal business operations.
Volvo Truck 1998  |  35,000 sf
Contract delivery :
Construction of a heavy truck sales center complete with showroom, full service garage, wash bays and lubrication pits.
Howmet-Cercast 1998  |  190,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
A 190,000 sf aluminum casting facility for an aerospace industry manufacturer. Tight tolerance levels of floors and stringent mechanical and electrical requirements were met to the exacting specifications of the manufacturer. Separate, specific environments were required for each of the different process departments.
Indigo Books 1998  |  30,000 sf
Contract delivery :
Fit-up of 30,000 sf for an airy, two-level bookstore with dramatic spiral staircase in downtown Montreal.
Fairmont Mont Tremblant 1997  |  350,000 sf
Contract delivery :
The center of the largest and most popular ski resort in Eastern North America, Chateau Mont Tremblant is a $35,000,000 development located at the edge of Mont Tremblant Park in Quebec’s Laurentian Mountains. Currently owned and managed by Fairmont Hotels, it includes a four-star, 317-room hotel, a shopping promenade, sports complex and a 40,000 square foot conference centre: all built by Reliance. The work was completed in just thirteen months, on schedule and within budget.
Cargo Dorval V 1997  |  205,000 sf
Contract delivery :
Construction Management
A 205,000 sf multi-tenant cargo warehouse facility constructed at Montreal'sPierreTrudeau Internationalairport for air freight carriers. Designed, built and made fully functional in less than 8 months. The facilty was built in "fast track" mode in order to replace the existing facility at Montreal's Mirabel Airport, which was relocated to Dorval.
CLSC Cote Des Neiges 1997  |  145,000 sf
Contract delivery :
This project was a precast and glass building including medical clinics, offices, two levels below grade for parking and a retail pavilion. Medical clinics required highly zoned ventilation systems with specific isolation requirements, provisions for laboratory equipment and high sanitation standards.
«