Puma Canada 2005  |  110,500 sf
Contract delivery :
Design Build Mechanical, Fixed Price
New Canadian head quarters for Puma including 20,500 sq. ft. of offices and a 90,000 sq. ft. warehouse. The warehouse includes 14 loading docks and 2 drive-in doors. The offices include a high-end showroom, a long span architectural stair and open mezzanine for the lobby area. The entire project was completed in just 3 and a half months.
Paris Star Lofts 2005  |  175,000 sf
Contract delivery :
Construction Management
This 6 storey, 84 unit condo conversion from a former dye factory in Montreal's Plateau Mont-Royal district included the complete stripping ofthe building to its bare structure fora new facade of precast, balconies, brick and floor to ceiling windows. The "loft" unit concept includes european kitchens, 12'-0" exposed concrete ceilings, and high end finishes.
Lowney's Phase I 2005  |  70,000 sf
Contract delivery :
Construction Management
Conversion and restoration of the 1902 Lowney’s wood structure chocolate factory (two buildings) to accommodate a new 110 unit condo development. Phase I of the development includes 1 floor of underground parking, exposed wood beams within each unit, a rooftop terrace complete with swimming pool, and contemporary finishes.
La Marquise 2005  |  331,000 sf
Contract delivery :
Construction Management
A 13 storey condominium development consisting of 104,000 sf of below grade parking, lobby and health complex including a swimming pool and 227,000 sf of finished luxury condo units. Reliance was responsible for a complete turn-key project, including core and shell, all mechanical systems and fit up of all 113 units according to the individual owner's requirements.
Kraft Foods 2005  |  530,000 sf
Contract delivery :
Construction Management
This is a new distribution and product mixing center for Kraft Canada. All products manufactured within 100 km of Montreal are shipped directly to this facility for eventual distribution across North America. Total building size is 530,000 square feet, 30'-0" clear, including 50'-0" bays, with refrigerated and air conditioned warehouse areas. The project was designed and built in a period of less than 8 months. As a result of the weak clay soils available, piled foundations and a drained construction platform with overbuilt access roads were required. Site logistics and the construction schedule were further complicated by the fact that the foundation work occurred in the early spring season. The slab design allows for heavy floor loading and includes features such as non-corrosive metallic hardener, special floor sealers and fully filled sawcuts. The shipping and receiving docks consist of continuous depressed trenches with vertical lift levelers, with all dock equipment, overhead doors, and dock lifts fully automated and integrally connected.
Époques Phase 2 2005  |  63,000 sf
Contract delivery :
Construction Management
A 61 unit, 63,000 square foot condo development, undertaken for Prevel in Old Montreal, Quebec. The quaint location for the project required underpinning of two existing turn-of-the-century buildings. The development includes a rooftop terrace with a “Zen” basin. All units are complete with hardwood flooring, hardwood doors and frames, and European kitchens and appliances.
Coach Canada 2005  |  17,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
The new 17,000 square foot head office for Coach Canada Bus Company includes a maintenance facility for buses complete with wash bays, engine replacement facility and administrative offices.
BMW Sainte-Julie 2005  |  15,900 sf
Contract delivery :
Design Build Mechanical, Fixed Price
BMW dealership, including full glass curtain wall façade, service and wash bay facilities, and administrative offices
Au Village du Musée 2005  |  60,455 sf
Contract delivery :
Construction Management
A 5-storey condominium development consisting of 6,000 sf of below ground parking, upgrade lobby and 47 finished luxury condo units. Reliance was responsible for completion and fit up of all 47 units according to the individual owner's requirements, including renovation to an existing building (circa 1890) configured for 5 ultra-luxurious "historic" condo units.
Moores Clothing 2004  |  84,500 sf
Contract delivery :
New 84,500 sf distribution center including 6,000 sf of offices and 120,000 sf of “veit” conveyor/racking system on 3 floors within the warehouse.
«