CanadaWide 2023  |  150,000 sq.ft.
Contract delivery :
Construction Management
Conversion of an existing bulk storage warehouse facility to a modernized refrigerated / freezer distribution center complete with exterior facades being re-built to meet the requirements of a refrigerated environment and upgrades to shipping / receiving activities. The exterior truck parking / loading dock facilities are being fully revamped to suit the conversion from a stagnant warehouse facility to a modern an effective shipping / receiving operation. The project includes the full removal and replacement of the rear building structure and foundation to suit the revised vocation of the building. The existing roofing system is being replaced to meet the new needs of the facility whiCh include a complete refrigeration system for the entire 150,000 square feet of the distribution center.

CLSC Cote Des Neiges 1997  |  145,000 sf
Contract delivery :
This project was a precast and glass building including medical clinics, offices, two levels below grade for parking and a retail pavilion. Medical clinics required highly zoned ventilation systems with specific isolation requirements, provisions for laboratory equipment and high sanitation standards.
CAE Electronics 2001  |  142,000 sf
Contract delivery :
Construction Management
Project included expansion of existing facility and addition of new floors on top of the original structure. Existing rooftop equipment was removed and relocated to the new roof while maintaining conditioning of occupied space below 24 hours a day. Dynamic load of flight simulators required construction of 18" and 24" independentslabs in some locations. Installation of mobile cranes, and mechanical and electrical systems were required for support and monitoring of the flight simulators.
Wilson Lofts 2012  |  140,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
Retrofit of a 1909 paper factory into an upscale loft style condominium in downtown Montreal overlooking a park. Originally six storeys, a complete reinforcement of the existing structure was necessary to carry an additional four floors. The building houses 98 residential units with 12' 0" exposed concrete ceilings and columns, exposed brick walls, and bamboo hardwood floors. Each unit is equipped with European kitchens, appliances, and plumbing fixtures.
Conglom 2010  |  140,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
Only Reliance could envision the transformation of this waste site into a valuable and fuctional plot of land. The site originally contained 20' - 0" of unsuitable fill material, but Reliance formulated a soil re-engineering plan that eliminated the need to import any material. Completed in 2010, this two storey LEED building totals 140,000 sf of office and warehouse space. The warehouse is approximately 30' 0" clear and includes over eight loading docks.
Novartis 2003  |  140,000 sf
Contract delivery :
Fixed Price
The new Canadian head office for Novartis Pharmaceuticals, features 140,000 square feet of finished office space including a state of the art, independently constructed basement computer room complete with a FM-200 system and stand-alone Liebert units, a cafeteria including a full commercial kitchen, fitness center and a modern conference and training center.
4220 Innes - Buildings F&J 2006  |  2 buildings, totaling 136,360 sf
Contract delivery :
Construction Management, Design Build
This project consisted of two retail anchor buildings, totaling 136,360 square feet, within a regional “Big Box” retail shopping Center in Ottawa, Ontario, Canada. Building ‘J’ is a multi-tenant 20,000 square foot retail building that was constructed for tenants such as Second Cup and Pier 1 Imports. Building ‘F’ was designed as a big box, multi-tenant retail comprising 116,360 square feet of gross construction, custom tailored to the individual specifications of the four more prominent retailers – Winners / Home Sense, Linen ‘N’ Things, Michael’s and the LCBO.
Labelle Tower 2022  |  134,260 sq.ft.
Contract delivery :
Construction Management
This new project includes the construction of a 4 storey, 78 unit rental building, and 1 storey of underground parking. The building is on a large lot where there is an operating Hampton Inn. The units range from 600 square feet to 1,400 square feet and the construction involves maintaining an existing outdoor pool which sits 5 feet from the new garage foundation wall. The project is 134,260 square feet of gross constructed area.
1250 Greene Avenue 2013  |  132,000 sf
Contract delivery :
Construction Management
With neoclassical architecture inspired by the great Parisian boulevards including a 100% stone-clad exterior, 1250 Avenue Greene comprises some twenty exclusive residences offering the intimacy of individual homes, designed and constructed to the personal taste and lifestyle of each owner. With its numerous balconies and landscaped terraces, high-end mechanical systems including a heat re-capture and humidification, 1250 Avenue Greene sets a new standard in residential construction in Montreal.
Browns Shoes 2014  |  131,500 sq.ft.
Contract delivery :
This fast-track office building and warehouse project achieved the LEED™ Silver certification. It consists of a poured concrete structure with retro plated floors including post-tensioned structural slabs, 2 storeys of high-end head office space with floor to ceiling glass, and three additional levels of office mezzanines, a 90,000 sq.ft. warehouse and indoor parking garage, and a 20’ by 30’ cantilevered executive conference room held up by post-tensioned beams located on the roof.


«